Home Addition Tie-Ins: What Must Connect to the Existing Building?

Plan an attached addition by reviewing the connections between old and new construction together: foundation and framing, roof and walls, floor levels, drainage, utilities, and circulation. Record the existing conditions and unknowns at each connection. A licensed engineer should address structural design or diagnosis; a contractor’s preliminary observations cannot establish concealed conditions or substitute for that professional review.